Toronto Transit Commission Pape Station

From CPTDB Wiki
Revision as of 19:40, 18 September 2012 by 8050 (talk | contribs)
Jump to navigation Jump to search
Arrow-left.png Westbound to Kipling Pape Eastbound to Kennedy Arrow-right.png
Next Station: Chester Next Station: Donlands
Pape
Toronto Transit Commission Pape Station-b.jpg
Rapid Transit Bloor-Danforth
Surface Routes 25, 72, 81
Presto No
Opening Date February 26, 1966
Platform Side
Ridership (2018) MISSING

Pape Station is a rapid transit stop and bus terminal owned and operated by the TTC, located at 650 Danforth Avenue, although the on-street location of the station is really at the intersection of Pape Avenue and Lipton Street, a block north of Danforth Avenue.

Station description

The entrance is located at the south-west corner of the property, right at the intersection of Pape and Lipton. A small building hosts both the entrance to the station and a cramped Tim Hortons (accessible through the unpaid area only). The entrance consists of a collector's booth and only 4 turnstyles, while a set of stairs and a single person width escalator lead down to the concourse. A door beside the escalator leads outside to a crosswalk to the bus terminal. Pape is the only station to allow passengers to walk across a bus roadway.

The concourse is essentially a tunnel connecting the entrance, bus terminal, and two platforms. Heading north from the stairs, down from the entrance, and under the bus driveway is an escalator and stairs to the bus terminal. Heading south and down a small set of stairs, a news stand is located at the stairs to the westbound platform, while a short distance south is the set of stairs to the eastbound platform.

The bus terminal is busy, yet lack-lustre. All three routes servicing Pape Station run frequent service. The crescent shaped bus terminal has the southbound buses (72) inside the curve and the northbound routes (25 and 81) outside the curve. A small glassed in booth protects waiting passengers from the elements, and another houses the stairs/escalator to the concourse.

The westbound subway platform.

Pape has two side platforms with the track in between, typical Bloor-Danforth stations. The Bloor-Danforth line also had a wall colour scheme that cycled along the line. At Pape, the two colours used are a yellow for the majority of walls and green trim along the top at platform level. The station name and some other signage engraved in the wall are painted to match the trim, and the station name engraved in the trim is painted to match the wall.

History

Even before the opening of the Bloor-Danforth subway and Pape Station, the area where the station currently exists had an important part of transit history. Harbord streetcars went up Pape Ave. to Danforth, where they used the station grounds to loop at Lipton Loop. The Harbord car was not going to operate after the station opening, so tracks were not laid in the station loop. It is unknown how the Harbord car looped with the closure of its Lipton loop.

Pape has remained relitavetly untouched since it's opening with the original section of the Bloor-Danforth subway. However, there have been many plans circulating for major changes and connections.

The first plan was to have the Downtown Relief line start at Pape and head down to either King or Queen streets, or Union Station. This would have made Pape an important and busy connection point, with passengers from Scarborough and East York using the station to transfer between lines. The plans languished, and eventually faded from all maps. This was partly due to improvements made to Bloor-Yonge station, and favour by governments to extend subways into vote-rich suburbs.

The Downtown Relief Line comes back in a way, however, when Transit City was announced. The Don Mills LRT line will terminate somewhere along the Danforth subway. Pape is one of the more popular options currently, because it allows the LRT to pass through the heavily populated Thorncliffe Park area, plus the current alignment of the Don Mills bus brings it to Pape. Studies are currently underway to see if the Leaside Bridge crossing the Don Valley is strong enough to support an LRT line, and if it proves able to then Pape will definitely be the main choice of terminal. As well, any alignment of the Don Mills LRT will likely permit it to be extended south and west to Downtown Toronto, becoming the long-lost Downtown Relief line in a new form.

Moderization=

In 2008, it was announced that Pape will be the first station to undergo work in the Station Modernization program. Pape was selected because of its current condition and because other work was planned at the station. The current plans are to add a new entrance at the east end of both subway platforms to comply with new fire standards, add elevators to make the station accessible, make the station more passenger-friendly (wider corridors and improved signage for example) and update the exterior and interior of the station. The bus terminal will also be directly connected to the entrance of the building, eliminating the inside roadway.[1]

In 2008, the east end of the eastbound platform has had its ceiling painted a dark blue. This was preliminary work relating to the modernization program. Platform ceilings will be painted dark blue from the original white. The original platform level wall tiles were removed in 2012. These will be replaced by large, light cream coloured porcelain tiles with a bright medium blue accent strip with the station name. Artwork by Allan Harding MacKay comprising of 112 digitally manipulated images of the station pre-modernization and surrounding area to form abstract images will be integrated into the walls.[2]

The station entrance will have granite containing five etched artwork images and a panel describing the art concept in a select location. the remaining walls of the entrance and bus terminal will be clad in dark grey porcelain tiles. The entrance stair enclosure walls will be replaced with glass and stainless steel balustrades containing three etched glass art images. The same will be done for the bus terminal stair enclosure two etched images.

Construction began in the fall of 2009 and was expected to be complete in 2012. However this has now changed to 2013.

Routes

Rapid Transit

Surface Transit

References


v·d·e
Toronto Transit Commission Logo.png
Miscellaneous
Vehicles Buses - Community Buses - Wheel-Trans - Streetcars - Subway - Rail Workcars - Support Vehicles
Current Divisions Arrow Rd - Birchmount - Davisville - Eglinton - Greenwood - Hillcrest - Lakeshore - Leslie Barns - Malvern - McNicoll - Mount Dennis - Queensway - Roncesvalles - Russell - Wilson
Former Divisions McCowan - Danforth - (Old) Eglinton - Lansdowne - St. Clair (Wychwood) - Vincent (Keele)
Current Projects RapidTO - Easier Access
Former Projects Network 2011 - OneCity - Transit City (Bus Plan - Light Rail Plan)
Bus Stops 1-999, 1000-1999, 2000-2999, 3000-3999, 4000-4999, 5000-5999, 6000-6999, 7000-7999, 8000-8999, 9000-9999, 10000-10999, 11000-11999, 12000-12999, 13000-13999, 14000-14999, 15000-15999, 16000-16999
Current Routes
Rapid Transit 1 (Yonge-University) - 2 (Bloor-Danforth) - 3 (Ontario Line) - 4 (Sheppard) - 5 (Eglinton Crosstown) - 6 (Finch West)
Bus 7 8 9 10 11 12 13 14 15 16 17 19 20 21 22 23 24 25 26 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 115 116 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 160 161 162 165 167 168 169 171 176 184 189
Downtown Express 141 142 143 144 145
Seasonal 200 201 202
Blue Night 300 301 302 304 306 307 310 312 315 320 322 324 325 329 332 334 335 336 337 339 341 343 352 353 354 363 365 384 385 395 396
Community Bus 400 402 403 404 405
Streetcar 501 503 504 505 506 507 508 509 510 511 512
Express Network 900 902 903 905 924 925 927 929 935 937 938 939 941 943 944 945 952 953 954 960 968 984 985 986 989 995 996
Former Routes
Rapid Transit 3 (Scarborough)
Bus 1 2 3 4 5 6 13 13 13 14 19 24 27 28 30 38 40 42 58 59 93 102 106 107 107 108 117 117 118 121 121 121 123 124 134 136 137 139 139 140 144 163 163 164 166 171 172 172 175 197 224 268 406 408
Rocket 185 186 188 190 191 192 193 194 194 195 196 198 199
Seasonal 174 203
Blue Night 302 303 305 307 308 309 310 311 313 315 316 317 319 321 383
Community 401 406 407 409 425
Streetcar 502 513 514 521 522
Express 913
Current Stations
Yonge-University Vaughan Metropolitan Centre - Highway 407 - Pioneer Village - York University - Finch West - Downsview Park - Sheppard West - Wilson - Yorkdale - Lawrence West - Glencairn - Eglinton West - St. Clair West - Dupont - Spadina - St. George - Museum - Queen's Park - St. Patrick - Osgoode - St. Andrew - Union - King - Queen - Dundas - College - Wellesley - Bloor-Yonge - Rosedale - Summerhill - St. Clair - Davisville - Eglinton - Lawrence - York Mills - Sheppard-Yonge - North York Centre - Finch
Bloor-Danforth Kipling - Islington - Royal York - Old Mill - Jane - Runnymede - High Park - Keele - Dundas West - Lansdowne - Dufferin - Ossington - Christie - Bathurst - Spadina - St. George - Bay - Bloor-Yonge - Sherbourne - Castle Frank - Broadview - Chester - Pape - Donlands - Greenwood - Coxwell - Woodbine - Main Street - Victoria Park - Warden - Kennedy
Sheppard Sheppard-Yonge - Bayview - Bessarion - Leslie - Don Mills
Bus Scarborough Centre
Former Stations
Rapid Transit Lower Bay - Lawrence East - Ellesmere - Midland - McCowan
Greater Golden Horseshoe Agencies
Barrie
Bradford West Gwillumbury
Brampton
Brantford
Burlington
Caledon
Durham Region
GO Transit
Grand River
Guelph
Hamilton
Metrolinx
Milton
Mississauga
Niagara Region
Oakville
Orangeville
Peterborough
Port Hope
Simcoe County
Toronto
York Region