GO Transit route 21 'Milton'
Revision as of 22:06, 15 April 2024 by TorontoTransportGuy (talk | contribs)
21
|
Route number
Nombre d'itinéraire |
Milton
|
| ||
Vehicles | Enviro500 Super Lo, D4500CT | |
Service Periods | Daily | |
See also | Milton GO Train |
21 Milton is a bus route operated by GO Transit. It serves as the Train-Bus replacement for the Milton GO Train during off-peak periods, although service to Square One GO Terminal is retained daily as well. This is a daily service. It is part of the Milton series of GO Transit routes.
- 21 Milton is one of the busiest bus routes operated by GO, serving as a link between Downtown Toronto and many parts of Mississauga, including Square One. The route is split into at least 2 sections for the majority of the operating hours. It also previously has the most branches of any GO route, with 18 lettered branches. As of April 27th, 2024 it will have 7 lettered branches.
- From April 8th, 2023-April 27th, 2024 Route 21 was realigned removing daily service to Union Station GO Bus Terminal. The 5 branches to operate 21 Milton-Union Station (All stops/Early Mornings, Late Nights) 21A Milton-Oakville, 21B Lisgar-Clarkson, 21C Erindale-Port Credit, 21D Lisgar-Clarkson (skipping Streetsville GO, and Erin Mills Transitway Station) to connect customers to the Lakeshore West GO Train which would take customers into Union Station to avoid heavy delays on the Gardiner Expressway due to long term construction. After huge customer backlash and complaints service was realigned back to Union Station GO Bus Terminal for the April 27th, 2024 Board change, All branches were re-lettered and no longer stops at Dixie GO.
- Customers traveling from Milton GO Station, Derry & 9th Line, and Meadowvale Town Centre can connect at Meadowvale GO Station to Route 27B if they are traveling towards Finch Bus Terminal.
Branches
This route has 4 branches:
- 21 Union Station GO Bus Terminal - Milton GO Station (All stops)
- 21A Union Station GO Bus Terminal - Milton GO Station (Express to Meadowvale GO)
- 21B Union Station GO Bus Terminal - Lisgar GO Station (Skips Square One, and Meadowvale GO)
- 21C Union Station GO Bus Terminal - Square One GO Bus Terminal via Cooksville GO
- 21D Union Station GO Bus Terminal - Meadowvale GO Station
- 21E Union Station GO Bus Terminal - Lisgar GO Station (Skips Meadowvale GO)
- 21F Union Station GO Bus Terminal - Milton GO Station (Skips Lisgar GO)
Historical Branches
- 21A Oakville GO Station - Milton GO Station via Trafalgar Rd & Highway 407 Park and Ride
- 21B Lisgar GO Station - Clarkson GO Station via Meadowvale GO, Streetsville GO, and Erin Mills Transitway Station)
- 21C Erindale GO Station - Port Credit GO Station via Square One, and Cooksville GO
- 21D Lisgar GO Station - Clarkson GO Station (Skips Streetsville GO, and Erin Mills Transitway Station)
Route structure
Major Stop | Branches | ||||||
Milton Milton GO |
21 | 21A | 21F | ||||
Mississauga Derry Rd. W @ Ninth Line |
21 | 21A | 21F | ||||
Mississauga Lisgar GO |
21 | 21B | 21E | ||||
Mississauga Aquitaine Ave. @ Meadowvale Town Centre Cir. |
21 | 21A | 21F | ||||
Mississauga Meadowvale GO |
21 | 21A | 21D | 21F | |||
Mississauga Streetsville GO |
21 | 21B | 21D | 21E | 21F | ||
Mississauga Erindale GO |
21 | 21B | 21D | 21E | 21F | ||
Mississauga Square One Bus Terminal |
21 | 21C | 21D | 21E | 21F | ||
Mississauga Cooksville GO |
21 | 21C | 21D | 21E | 21F | ||
Toronto Union Station Bus Terminal |
21 | 21A | 21B | 21C | 21D | 21E | 21F |