Sound Transit Link 2 Line: Difference between revisions

From CPTDB Wiki
Jump to navigation Jump to search
No edit summary
Line 27: Line 27:
|-
|-
|'''Opened'''
|'''Opened'''
|Spring 2024 (Planned)
|April 27, 2024 (Planned)
|-valign="top"
|-valign="top"
|'''Owner'''
|'''Owner'''
Line 58: Line 58:
[[File:Sound_Transit_East_Link_Extension_Map-a.png|800px]]
[[File:Sound_Transit_East_Link_Extension_Map-a.png|800px]]
|}
|}
Sound Transit Link 2 Line is a light rail line operated by [[Sound Transit]] in Seattle and the surrounding area. Operations for the 2 line are currently under contract to [[King County Metro]], which operates all train services. Line 2 is mainly comprised of the [[Sound Transit East Link]] extension and connects to the original central link section to Lynnwood.  
The Link Light Rail 2 Line is a light rail line operated by [[Sound Transit]] in King County, WA. Operations and maintenance for the 2 line are under contract to [[King County Metro]]. The line runs on the East Link extension, and will connect with the [[Sound Transit Link 1 Line|1 Line]] at International District/Chinatown Station and interline with it up to Lynnwood City Center station once the I-90 section of the extension is opened.


==Route Details==
==Route Details==
The route starts with [[Sound Transit South Bellevue Station|South Bellevue Station]] at the western end, runs via Downtown Bellevue, with [[Sound Transit Redmond Technology Station|Redmond Technology Station]] being the eastern terminus.
The initial route on the Starter Line starts with [[Sound Transit South Bellevue Station|South Bellevue Station]] at the western end and heads north along Bellevue Way and 112th Ave SE. Between East Main Bellevue Downtown stations, the line heads through a tunnel under Downtown Bellevue, passing over I-405 immediately after Bellevue Downtown and briefly following the Eastrail alignment before turning east along Spring Blvd, in a trench at Spring District station before moving to a street-running median alignment at 130th Ave. After the section of street-running ends at the intersection of 136th Pl NE and NE 20th St, the line follows SR-520 for the rest of the line to the eastern terminus at [[Sound Transit Redmond Technology Station|Redmond Technology Station]].


===Stations===
===Stations===
Line 70: Line 70:
* [[Sound Transit Downtown Bellevue Station|Downtown Bellevue]]
* [[Sound Transit Downtown Bellevue Station|Downtown Bellevue]]
* [[Sound Transit Wilburton Station|Wilburton]]
* [[Sound Transit Wilburton Station|Wilburton]]
* [[Sound Transit Spring District/120th Station|Spring District/120th]]
* [[Sound Transit Spring District Station|Spring District]]
* [[Sound Transit Bel-Red/130th Station|Bel-Red/130th]]
* [[Sound Transit BelRed Station|BelRed]]
* [[Sound Transit Overlake Village Station|Overlake Village]]
* [[Sound Transit Overlake Village Station|Overlake Village]]
* [[Sound Transit Redmond Technology Station|Redmond Technology]]
* [[Sound Transit Redmond Technology Station|Redmond Technology]]


===Future Stations===
===Future Stations (2025)===
 
* [[Sound Transit Lynnwood City Center Station|Lynnwood City Center]]
* [[Sound Transit Mountlake Terrace Station|Mountlake Terrace]]
* [[Sound Transit Shoreline North/185th Station|Shoreline North/185th]]
* [[Sound Transit Shoreline South/148th Station|Shoreline South/148th]]
* [[Sound Transit Northgate Station|Northgate]]  
* [[Sound Transit Northgate Station|Northgate]]  
* [[Sound Transit Roosevelt Station|Roosevelt]]  
* [[Sound Transit Roosevelt Station|Roosevelt]]  

Revision as of 23:14, 16 February 2024

System Link Light Rail
Type Light rail transit
Number of stations 8
Cities serviced Bellevue, Redmond
Termini South Bellevue
Redmond Technology
Operations
Opened April 27, 2024 (Planned)
Owner Sound Transit (2024–present)
Operator King County Metro
Rolling stock Sound Transit 101-135 TransLink Accessible bullet-b.png
Sound Transit 136-162 TransLink Accessible bullet-b.png
Sound Transit 201-352 TransLink Accessible bullet-b.png
Technical
Line length 14 mi (Full East Link)
Track gauge 1,435 mm (4 ft 8 1⁄2 in)
Electrification 1500V DC Overhead
Operating speed 89 km/h (55 mph)
Line Diagram

The Link Light Rail 2 Line is a light rail line operated by Sound Transit in King County, WA. Operations and maintenance for the 2 line are under contract to King County Metro. The line runs on the East Link extension, and will connect with the 1 Line at International District/Chinatown Station and interline with it up to Lynnwood City Center station once the I-90 section of the extension is opened.

Route Details

The initial route on the Starter Line starts with South Bellevue Station at the western end and heads north along Bellevue Way and 112th Ave SE. Between East Main Bellevue Downtown stations, the line heads through a tunnel under Downtown Bellevue, passing over I-405 immediately after Bellevue Downtown and briefly following the Eastrail alignment before turning east along Spring Blvd, in a trench at Spring District station before moving to a street-running median alignment at 130th Ave. After the section of street-running ends at the intersection of 136th Pl NE and NE 20th St, the line follows SR-520 for the rest of the line to the eastern terminus at Redmond Technology Station.

Stations

Stations are listed in order, traveling from West to East.

Future Stations (2025)

Service Frequency

File:2 Line Logo and Symbol-a.png Frequency
Peak Hours X mins.
Midday X mins.
Evening X mins.
Late Night X mins.
Early Mornings X mins.
Saturdays and
Sundays/Holidays
X mins.

First and Last Trains

Westbound Service

Redmond Technology to South Bellevue
File:2 Line Logo and Symbol-a.png First Train from
Beacon Hill
*
First Train Last Train
Weekdays TIME TIME. TIME
Saturdays TIME TIME TIME
Sundays/Holidays TIME TIME TIME


Eastbound Service

South Bellevue to Redmond Technology
File:2 Line Logo and Symbol-a.png First Train from
SODO
*
First Train Last Train Last Train to
Stadium**
Weekdays TIME TIME TIME TIME
Saturdays TIME TIME TIME TIME
Sundays/Holidays TIME TIME TIME TIME

History

  • Spring 2024 - Line 2 Starter Line from South Bellevue to Redmond Technolgy Station Opens

Future Plans

Downtown Redmond Extension

Future Extensions

  • Spring 2025 - extension to Downtown Redmond
  • 2025 - extension to Downtown Seattle/Northgate/Lynnwood

References



v·d·e
Sound Transit Logo.gif
Fleet
ST Express 9092-9121 9122-9123 9124-9126 9201-9222 9301-9312 9553-9565 9566-9583 9584-9586 9587-9596 9624-9636 9637-9647 9648-9651 9652-9659 9660-9690 9713-9719 9720-9722 9723-9739 9800-9813 9814-9817 9818-9822 41501-41517 41601-41605 51401-51403 61401-61407 91501-91505 91701-91732 91901-91913
Retired ST Express 801-827 5019-5021,5194-5210 9000-9069 9070-9089 9090-9091 9200 9400-9419 9500-9524 9525-9536 9537-9552 9600-9621 9622-9623 9700-9712
Sounder 101-104 112-118 201-214 201-230 231-240 301-307 321-329 401-410 901-906 907-911 921-923
Tacoma Link 1001-1003 2001-2005
Central Link 101-135 136-162 201-352
Non-service fleet
Routes
Sound Transit Express Logo.png

510 512 513 522 532 535 541 542 544 545 550 554 555 556 560 566 567 574 577 578 580 586 590 592 594 595 596

Former:

505 506 508 511 530 531 540 546 564 565 570 582 585 591 593 599

Stride BRT Future:

S1 Line S2 Line S3 Line

Sound Transit Link Logo.png Central Link Tacoma Link

Line 1 (Sound Transit) icon-a.png1 Line Line T (Sound Transit) icon-a.pngT Line

Future:

Sound Transit Link 2 Line Logo-a.png2 Line (2024) 3 Line (2030) 4 Line (2041)

Sound Transit Sounder Logo.png Sound Transit N Line icon-a.pngN Line Sound Transit S line icon-a.pngS Line
Puget Sound Region Agencies
Seattle
Seattle
Puget Sound
Lynnwood
Everett
Tacoma
Olympia
Seattle
Port Angeles
Bremerton
Bremerton
Aberdeen/Hoquiam
Shelton
Oak Harbor/Coupeville
Port Townsend
Mount Vernon/Burlington
Bellingham