Jump to content

randall

Member
  • Posts

    240
  • Joined

  • Last visited

2 Followers

Recent Profile Visitors

The recent visitors block is disabled and is not being shown to other users.

randall's Achievements

  1. Not entirely sure, but I think it will take some time to update the TR and update signage so you probably will hear Eglinton West on the trains still but the maps on trains will be updated try seeing how long it took for things to update about Downsview to Sheppard West
  2. Will Eglinton West Stn have signs like Sheppard Wests?
  3. If I recall properly, Proterra was recently bought out and saved from the bankruptcy
  4. Any reason why they got retired so early? I know they aren't liked much but any specific reason?
  5. If there was faith in Metrolinx I think a joint opening would be reasonable however, Line 5 just had an accident so I don't know if either November or Decemeber is possible at this point
  6. So the Proterra era is over I assume?
  7. There might be, 124 might get discontiuned and the 52F might get rerouted to Sunnybrook Hospital for the 2026 ASP and the 11 extended to Lawrence so itd be, 11, 52, 162 ( a bus that rarely comes) and the 952 (rush hour service, weekdays) its not a ridiculous proposal
  8. I don't think its that far off, I think every three minutes is a bit of a stretch maybe within rush hour but otherwise 4-5 mins
  9. Big changes (54 Lawrence, 34 Eglinton East, 32 Eglinton West and its branches) will begin once the Crosstown does open I am assuming with the service changes being revealed for this month, the busses stopping within the bus terminals for Line 5 will basically be "free" rides until they actually have to tap onto busses
  10. Signs outside of Keelesdale Station says 3-5 mins with schedules being like: 7am - 3am (or 2am) To Mount Dennis 5am - 1am To Kennedy
  11. 1379 also out on the 52 Lawrence West today
  12. Pretty sure that was just Phil Verster, Micheal Lindsay is somewhat better
  13. Does anyone know when the new busses for Line 5 Eglinton will have there service schedules released?
  14. I see it potentially opening by November service changes, with no delays due to infrastructure with it also maybe alongside opening alongside Line 6
×
×
  • Create New...