National Railroad Passenger Corporation (Amtrak) 300-424 are Siemens Charger ALC-42 locomotives built in 2020-24.

Engine Horsepower Gearing Top Speed Passenger heating
Cummins QSK95 4,200 hp 125 mph HEP generator

History

Order/delivery

An initial $850 million order for 75 new locomotives for the long-distance fleet was placed with Siemens in December 2018. The contract has options to purchase up to an additional 100 locomotives.[1] This order follows the successful operation of Charger locomotives on state-sponsored corridors in California, Illinois, Michigan, Missouri, Oregon, and Washington. These new locomotives are expected to replace much of the 'Genesis' series of locomotives (1-207 and 800-843).

Siemens made number of modifications from the standard Charger model to suit Amtrak's operational needs for long-distance service. These changes include larger fuel, diesel exhaust fluid, and sand tanks; increased HEP generating capacity; a modified front nose to improve repairability; and a derated engine to 4,200 horsepower (down from 4,400 hp) intended to lengthen maintenance intervals. The front nose is designed to match the appearance to the Cities Sprinter model, already in use by Amtrak on its electrified corridors. Other features standard to the Charger lineup include being equipped with Positive Train Control (PTC), Crash Energy Management (CEM) technology, and Tier 4-compliant Cummins QSK95 prime movers. The new model has been designated as Amtrak Long-distance Charger, or ALC-42.

The first unit was delivered to Amtrak on June 17, 2021, with deliveries expected to continue until 2024. Five of the first six locomotives will be delivered in the Phase VI livery, while unit 301 was delivered in a heritage "Day One" livery, as originally worn by E8A locomotive 4316, to celebrate Amtrak's 50th anniversary.[2] The remaining locomotives will be delivered in the Phase VII livery.

In June 2022, an additional 50 locomotives (375-424) were added to the order, bringing the total number of ALC-42 locomotives in Amtrak's fleet to 125.[3]

Routes

The ALC-42 fleet is expected to serve on all long-distance routes on the Amtrak network, including Auto Train, California Zephyr, Capitol Limited, Cardinal, City of New Orleans, Coast Starlight, Crescent, Empire Builder, Lake Shore Limited, Palmetto, Silver Meteor, Silver Star, Southwest Chief, Sunset Limited, and Texas Eagle. They will also likely see service on short- and medium-distance routes, substituting for state-owned power.

Details

Fleet Number Thumbnail Date Serial Livery Status/Disposal Notes
300 06/2021 CHR-100 Phase VI Retired
June 2023
  • Delivered on June 17, 2021.
  • Involved in accident in Moorpark, CA on June 28, 2023.[4]
301 07/2021 CHR-101 Heritage
(Day One)
Active
  • Delivered in special heritage livery.
302 Amtrak 302-a.jpg 11/2021 CHR-102 Phase VI Active
303 11/2021 CHR-103 Phase VI Active
304 01/2022 CHR-104 Phase VI Active
305 01/2022 CHR-105 Phase VI Active
306 02/2022 CHR-106 Phase VI Active
307 02/2022 CHR-107 Phase VI Active
308 04/2022 CHR-108 Phase VI Active
309 04/2022 CHR-109 Phase VII Active
310 05/2022 CHR-110 Phase VII Active
311 05/2022 CHR-111 Phase VII Active
312 07/2022 CHR-112 Phase VII Retired
April 2023
  • Involved in accident near Mobile, AL on April 26, 2023.
313 08/2022 CHR-113 Phase VII Active
314 08/2022 CHR-114 Phase VII Active
315 11/2022 CHR-115 Phase VII Active
316 11/2022 CHR-116 Phase VII Active
317 11/2022 CHR-117 Phase VII Active
318 11/2022 CHR-118 Phase VII Active
319 11/2022 CHR-119 Phase VII Active
320 12/2022 CHR-120 Phase VII Active
321 03/2023 CHR-121 Phase VII Active
322 12/2022 CHR-122 Phase VII Active
323 02/2023 CHR-123 Phase VII Active
324 02/2023 CHR-124 Phase VII Active
325 03/2023 CHR-125 Phase VII Active
326 03/2023 CHR-126 Phase VII Active
327 03/2023 Phase VII Delivered
328 04/2023 Phase VII Delivered
329 04/2023 Phase VII Delivered
330 05/2023 Phase VII Delivered
331 05/2023 Phase VII Delivered
332 05/2023 Phase VII Delivered
333 Phase VII
334 05/2023 Phase VII Delivered
335 07/2023 Phase VII Delivered
336 07/2023 Phase VII Delivered
337 Phase VII
338 Phase VII
339 Phase VII
340 Phase VII
341 Phase VII
342 Phase VII
343 Phase VII
344 Phase VII
345 Phase VII
346 Phase VII
347 Phase VII
348 Phase VII
349 Phase VII
350 Phase VII
351 Phase VII
352 Phase VII
353 Phase VII
354 Phase VII
355 Phase VII
356 Phase VII
357 Phase VII
358 Phase VII
359 Phase VII
360 Phase VII
361 Phase VII
362 Phase VII
363 Phase VII
364 Phase VII
365 Phase VII
366 Phase VII
367 Phase VII
368 Phase VII
369 Phase VII
370 Phase VII
371 Phase VII
372 Phase VII
373 Phase VII
374 Phase VII
375 Phase VII
376 Phase VII
377 Phase VII
378 Phase VII
379 Phase VII
380 Phase VII
381 Phase VII
382 Phase VII
383 Phase VII
384 Phase VII
385 Phase VII
386 Phase VII
387 Phase VII
388 Phase VII
389 Phase VII
390 Phase VII
391 Phase VII
392 Phase VII
393 Phase VII
394 Phase VII
395 Phase VII
396 Phase VII
397 Phase VII
398 Phase VII
399 Phase VII
400 Phase VII
401 Phase VII
402 Phase VII
403 Phase VII
404 Phase VII
405 Phase VII
406 Phase VII
407 Phase VII
408 Phase VII
409 Phase VII
410 Phase VII
411 Phase VII
412 Phase VII
413 Phase VII
414 Phase VII
415 Phase VII
416 Phase VII
417 Phase VII
418 Phase VII
419 Phase VII
420 Phase VII
421 Phase VII
422 Phase VII
423 Phase VII
424 Phase VII

References