The City of Ottawa approved an extension of the [[Ottawa-Carleton Regional Transit Commission O-Train 'Trillium Line'|Trillium Line]] from Greenboro Station to just west of Limebank Road, as well as a section to the Macdonald-Cartier International Airport. Two new stations will also be added along the existing line with one at Gladstone and one at Walkley. Existing stations will also have their platforms lengthened to accommodate longer trains. TransitNEXT, a subsidiary of SNC-Lavalin, was selected as the preferred proponent to build the extension.
The City of Ottawa approved an extension of the [[Ottawa-Carleton Regional Transit Commission O-Train 'Trillium Line'|Trillium Line]] from Greenboro Station to just west of Limebank Road, as well as a section to the Macdonald-Cartier International Airport. Two new stations will also be added along the existing line with one at Gladstone and one at Walkley. Existing stations will also have their platforms lengthened to accommodate longer trains. TransitNEXT, a subsidiary of SNC-Lavalin, was selected as the preferred proponent to build the extension.


Stadler was awarded the contract to supply seven four-car trains for the Trillium Line expansion. The diesel-electric multiple units will have four 480 kW diesel engines meeting Tier 4 emissions standards and will be able to travel up to 120 km/h. The trains will be built in Bussnang, Switzerland. Delivery is expected in mid-2021.<ref>"Stadler awarded Ottawa DMU contract". 23 April 2019. ''Railway Gazette''.</ref>
Stadler was awarded the contract to supply seven four-car trains for the Trillium Line expansion. The diesel-electric multiple units will have four 480 kW diesel engines meeting Tier 4 emissions standards and will be able to travel up to 120 km/h. The trains will be built in Bussnang, Switzerland. Delivery was expected in mid-2021.<ref>"Stadler awarded Ottawa DMU contract". 23 April 2019. ''Railway Gazette''.</ref> The first FLIRT set for Ottawa was completed in September 2021 and ready for delivery. By early October, it had arrived in Ontario.
 
==Arrow==
Three two-car FLIRT diesel multiple units (DMUs) were ordered by the San Bernardino County Transportation Authority in 2017 for the Arrow commuter rail line. They would enter service in 2022. In 2019, the San Bernardino County Transportation Authority ordered one hydrogen fuel cell powered FLIRT for delivery in 2024. Known as the FLIRT H2, it will be the first hydrogen-powered passenger train to operate in the United States.<ref>"Green-Tech for the US: Stadler signs first ever contract for Hydrogen-powered train." Press release. Stadler Rail, 14 September 2019.</ref>
 
In mid-November 2021, the first of three FLIRT DMUs were outshopped from Stadler's factory in Salt Lake City. The three DMUs entered service on October 24, 2022 with the official opening of the Arrow line.
 
==Operators==
==Operators==
===Canada [[Image:Flag of Canada.png|28px]]===
===Canada [[Image:Flag of Canada.png|28px]]===
Line 20: Line 26:
===United States [[Image:Flag of the United States.png|28px]]===
===United States [[Image:Flag of the United States.png|28px]]===
* [[Fort Worth Transportation Authority|Trinity Metro]] (TEXRail) - Fort Worth, Taxes
* [[Fort Worth Transportation Authority|Trinity Metro]] (TEXRail) - Fort Worth, Taxes
* [[Metrolinx|Redlands Passenger Rail|Arrow]] - San Bernardino County, California (On order)
* [[Dallas Area Rapid Transit]] - Dallas, Taxes
* [[Southern California Regional Rail Authority|Redlands Passenger Rail (Arrow)]] - San Bernardino County, California (On order)


==References==
==References==
<references/>
<references/>
[[Category:Rail vehicle]]
[[Category:Rail vehicle]]

Latest revision as of 12:15, 25 November 2022

The Stadler Rail FLIRT is a single level, low platform diesel or electric multiple unit (DMU or EMU). FLIRT is a German acronym for Flinker Leichter Innovativer Regional Triebzug which translates to Fast Light Innovative Regional Train. Like the Stadler Rail KISS, the FLIRT uses an aluminum vehicle body which has reduced weight and allowed for improved energy efficiency. Trains can be composed of two to six cars. The FLIRT has a maximum speed of 160 kilometres per hour.

The FLIRT was developed for Swiss Federal Railways in 2002. The order for 42 four-car EMUs began delivery in 2004.

TEXRail

In June 2015, Stadler was awarded a contract to provide eight FLIRT diesel-electric trainsets for the TEXRail commuter railway in Fort Worth, Texas. Each set is composed of five cars with the middle car containing two Deutz TCD 16.0 V8 520 kW diesel engines that comply with the EPA Tier 4 Final emission standards. The fully accessible trains can seat 224 passengers and provide them with side tables and USB ports.[1]

The FLIRT meets the alternative vehicle technology requirements of the Federal Railroad Administration (FRA). Because the project is federally funded, the order is subject to Buy America requirements. Stadler opened a manufacturing facility in Utah that will complete the cars. The body shells and bogies will be manufactured in Switzerland.[2]

In August 2017, Stadler announced that they have completed the first FLIRT DMU. It was put on display at the 2017 American Public Transportation Association (APTA) Expo in Atlanta, Georgia. The trains were to enter service on the TEXRail line at the end of 2018. Service eventually commenced on January 10, 2019.

OC Transpo Trillium Line

The City of Ottawa approved an extension of the Trillium Line from Greenboro Station to just west of Limebank Road, as well as a section to the Macdonald-Cartier International Airport. Two new stations will also be added along the existing line with one at Gladstone and one at Walkley. Existing stations will also have their platforms lengthened to accommodate longer trains. TransitNEXT, a subsidiary of SNC-Lavalin, was selected as the preferred proponent to build the extension.

Stadler was awarded the contract to supply seven four-car trains for the Trillium Line expansion. The diesel-electric multiple units will have four 480 kW diesel engines meeting Tier 4 emissions standards and will be able to travel up to 120 km/h. The trains will be built in Bussnang, Switzerland. Delivery was expected in mid-2021.[3] The first FLIRT set for Ottawa was completed in September 2021 and ready for delivery. By early October, it had arrived in Ontario.

Arrow

Three two-car FLIRT diesel multiple units (DMUs) were ordered by the San Bernardino County Transportation Authority in 2017 for the Arrow commuter rail line. They would enter service in 2022. In 2019, the San Bernardino County Transportation Authority ordered one hydrogen fuel cell powered FLIRT for delivery in 2024. Known as the FLIRT H2, it will be the first hydrogen-powered passenger train to operate in the United States.[4]

In mid-November 2021, the first of three FLIRT DMUs were outshopped from Stadler's factory in Salt Lake City. The three DMUs entered service on October 24, 2022 with the official opening of the Arrow line.

Operators

Canada  

United States  

References

  1. Stadler and the Fort Worth Transportation Authority unveil the first U.S. FLIRT train. Press release. 09 October 2017.
  2. [1]
  3. "Stadler awarded Ottawa DMU contract". 23 April 2019. Railway Gazette.
  4. "Green-Tech for the US: Stadler signs first ever contract for Hydrogen-powered train." Press release. Stadler Rail, 14 September 2019.