Washington Metropolitan Area Transit Authority: Difference between revisions

→‎Divisions: update for Cinder Bed's opening
(→‎Divisions: update for Cinder Bed's opening)
Line 108: Line 108:
|Replaced for Southeastern Garage<ref name=A1/><br>Opened Sept. 28, 2012. Uses diesel, hybrid, and CNG buses. Will use articulated buses in the future.  
|Replaced for Southeastern Garage<ref name=A1/><br>Opened Sept. 28, 2012. Uses diesel, hybrid, and CNG buses. Will use articulated buses in the future.  
|- align="center"
|- align="center"
|Cinder Bed  
|Cinder Bed (C)
|7901 Cinder Bed Rd., Lorton, VA 22079
|7901 Cinder Bed Rd., Lorton, VA 22079
|160
|160
|3 (used for training)
|3 (used for training)
|N/A
|N/A
|Replacement for Royal Street Garage<br>Planned to open in late 2018<ref name=A4>[https://wtop.com/tracking-metro-24-7/2017/09/metros-plans-longer-buses-rebuilding-110-year-old-garage/]</ref>.
|Replacement for Royal Street Garage<br>Opened in the last weekend of 2018<ref name=A4>[https://wtop.com/tracking-metro-24-7/2017/09/metros-plans-longer-buses-rebuilding-110-year-old-garage/]</ref>.
|- align="center"
|- align="center"
|Andrews Federal Center
|Andrews Federal Center
Editor
38,167

edits