TransLink: Difference between revisions

19 bytes added ,  23:19, 13 April 2018
Line 324: Line 324:
At the moment, the extension is planned to be open as early as 2025.
At the moment, the extension is planned to be open as early as 2025.


As part of Phrase 3 the Millennium Line Broadway Subway will be extended to UBC.
'''Phrase 2'''
Millennium Line Broadway Subway will be extended to UBC from Arbutus Street Station.


===Pattullo Bridge Replacement===
===Pattullo Bridge Replacement===
6,278

edits