TransLink: Difference between revisions

17 bytes added ,  23:20, 13 April 2018
Line 324: Line 324:
At the moment, the extension is planned to be open as early as 2025.
At the moment, the extension is planned to be open as early as 2025.


'''Phrase 2'''
===Phrase 2 extension to UBC===
Millennium Line Broadway Subway will be extended to UBC from Arbutus Street Station.
Millennium Line Broadway Subway will be extended to UBC from Arbutus Street Station.


6,278

edits