Mississauga Transitway: Difference between revisions

no edit summary
No edit summary
No edit summary
Line 1: Line 1:
{| align="right" width="350px" style="background: white; -moz-border-radius: 1em; border: 5px solid #015DAA"
|colspan="2"| <center>[[File:Mississauga Transitway logo-a.jpg]]</center>
|-
|colspan="2"|
----
|-
| '''Area served''' || Mississauga and Toronto, ON
|-
| '''Opened''' ||  November 17, 2014
|-
| '''Number of Stations''' || 12
|}
The '''Mississauga Transitway''' is a dedicated bus right of way in the city of Mississauga, Ontario. An 18-kilometre, two-lane, grade-separated road will run from Winston Churchill Boulevard to Renforth Drive, with 12 station that will provide connections to other routes and transit systems. The BRT corridor will be serviced by [[Mississauga Transit]] and [[GO Transit]]. Construction commenced in 2010, and the first phase is scheduled to open in November 2014 and the second phase in 2016.
The '''Mississauga Transitway''' is a dedicated bus right of way in the city of Mississauga, Ontario. An 18-kilometre, two-lane, grade-separated road will run from Winston Churchill Boulevard to Renforth Drive, with 12 station that will provide connections to other routes and transit systems. The BRT corridor will be serviced by [[Mississauga Transit]] and [[GO Transit]]. Construction commenced in 2010, and the first phase is scheduled to open in November 2014 and the second phase in 2016.


Editor
3,509

edits