Editor
8,312
edits
Aznichiro115 (talk | contribs) No edit summary |
Aznichiro115 (talk | contribs) |
||
Line 76: | Line 76: | ||
==History== | ==History== | ||
*Construction on the Swift Orange Line is expected to start in 2022, which involves redesigning the transit centers at both ends of the route. | *Construction on the Swift Orange Line is expected to start in 2022, which involves redesigning the transit centers at both ends of the route. | ||
*Service | *Service started on March 30th, 2024. | ||
==References== | ==References== |