Editor
1,029
edits
Aznichiro115 (talk | contribs) |
|||
Line 75: | Line 75: | ||
==History== | ==History== | ||
*Construction on the Swift Orange Line | *Construction on the Swift Orange Line started in 2022, which involved redesigning the transit centers at both ends of the route. | ||
*Service started on March 30th, 2024. | *Service started on March 30th, 2024. | ||