Editor
1,032
edits
No edit summary |
|||
Line 21: | Line 21: | ||
In November 2017, Puget Sound area transit agency [[Sound Transit]] placed an order for five Liberty LRVs for their [[Sound Transit T Line|Link T Line]] extension. The first car was shipped to Tacoma in March 2022. The contract also an option for 5 additional vehicles. <ref>http://www.railjournal.com/index.php/north-america/sound-transit-orders-brookville-lrvs-for-tacoma-link-extension.html?channel=535</ref> | In November 2017, Puget Sound area transit agency [[Sound Transit]] placed an order for five Liberty LRVs for their [[Sound Transit T Line|Link T Line]] extension. The first car was shipped to Tacoma in March 2022. The contract also an option for 5 additional vehicles. <ref>http://www.railjournal.com/index.php/north-america/sound-transit-orders-brookville-lrvs-for-tacoma-link-extension.html?channel=535</ref> | ||
Brookville introduced a redesigned Liberty streetcar, named the NXT, with the streetcars built for [[Valley Metro]], which started deliveries in March 2021. <ref>https://www.brookvillecorp.com/brookville-delivers-first-of-six-off-wire-capable-liberty-nxt-streetcars-to-valley-metros-tempe-streetcar/</ref> | |||
==Specifications== | ==Specifications== |