On 11/22/2020 at 12:49 PM, MiExpress said:

MiWay's training department as well as the union health and safety committee began conducting testing runs at Kipling in mid-October.

While there has been much speculation about the date, the current board period (October 26-December 20) schedules and driver crewing is based on service to Islington Station, as is the 2 week holiday board period (December 21-January 3). However, the schedules for the January 4, 2021 board period are based on operating from Kipling Station. 

Given that MiWay's move to Kipling Station comes with a host of routing and schedule changes, a move to Kipling in the middle of a board period would be awkward. Many of the routes will also have buses eliminated due to the shorter routing and this impacts driver crewing. Given those factors, I think it's fair to speculate that service to Kipling will begin on January 4 with the start of a new board period. However, that is just my opinion based on the situation and it's entirely possible service could begin on a different date than that, with 'interim' schedules and a lot of confusion!

Latest word on Kipling is that it will indeed open on January 4 but the tunnel connection to the subway will not be complete. There is talk of a shuttle bus service to transport people to/from the terminal. 

Link to comment
Share on other sites

Holiday service schedule starting December 20th and January 4th posted:

https://www.mississauga.ca/miway-transit/service-changes/holiday-service-dates-for-2020/

https://www.mississauga.ca/miway-transit/service-changes/jan-4-2021-service-changes/

 

The key takeaway is that there is no free or extended New Years Eve service due to COVID-19. 

Free transit was provided due to the pandemic until a barrier solution could be provided regarding the handling of paper transfers before a printed version became available. This is along with rear door boarding where possible and capacity limits. Since most transit agencies could not collect fares from the rear door, it is pretty much an easy solution. Even if people wanted to pay, how would the cash be handled along with tickets which requires front-door boarding. 

Link to comment
Share on other sites

On 12/7/2020 at 7:08 PM, MiExpress said:

Latest word on Kipling is that it will indeed open on January 4 but the tunnel connection to the subway will not be complete. There is talk of a shuttle bus service to transport people to/from the terminal. 

Based on the Jan. 4 Service Changes below it looks like they won't be switching over to the Kipling Terminal.  If the tunnel isn't complete they can still access the subway via the GO platform.  Of course it won't be accessible which is probably why they're holding off on the transfer.

They had a tease of a Service Change announcement for Dec. 7 which turned out to be lockdown-related service reductions.

Quote

MiWay will be implementing service changes on Dec. 7 as we adjust service levels in response to the COVID-19 grey level lockdown. Routes impacted: 61, 103, 107, 109, 305, 306, 310, and 347. Please see below for details.

Google has apparently started identifying the platforms at Kipling, even though there's currently no scheduled service.

Kipling Terminal Google.png

15 hours ago, GTAmissions1 said:

Holiday service schedule starting December 20th and January 4th posted:

https://www.mississauga.ca/miway-transit/service-changes/holiday-service-dates-for-2020/

https://www.mississauga.ca/miway-transit/service-changes/jan-4-2021-service-changes/

 

The key takeaway is that there is no free or extended New Years Eve service due to COVID-19. 

Free transit was provided due to the pandemic until a barrier solution could be provided regarding the handling of paper transfers before a printed version became available. This is along with rear door boarding where possible and capacity limits. Since most transit agencies could not collect fares from the rear door, it is pretty much an easy solution. Even if people wanted to pay, how would the cash be handled along with tickets which requires front-door boarding. 

Similar to the measure the TTC is taking, in an attempt to dissuade people from gathering to celebrate New Year's service is not being extended.  It was never really clear who was paying for the free service after 7pm, but if it was coming out of the City's budget, then I can see why they wouldn't be offering it this year.

The Holiday Service Changes include the now seemingly standardized list of routes not operating on Christmas and New Year's Day (and Family Day with the Jan. 4 notice) - 6 CREDIT WOODLANDS (Christmas and New Year's only), 28 CONFEDERATION (Family Day only), 35 EGLINTON, 46 TENTH LINE-OSPREY, 48 ERIN MILLS and 68 TERRY FOX.  If this is a result of budgetary shortfalls from COVID how much longer will the reduced holiday service continue?  As it would probably be time to just have a separate Sunday and Holiday Service Map.

For posterity, here's the Dec. 20, 2020 Service Change notice:

Holiday service – December 21, 2020 to January 3, 2021

Regular service will resume on Monday, January 4, 2021.

This year MiWay will not offer extended evening service or free rides on New Year’s Eve, in light of COVID-19 restrictions on social gatherings.

Some routes will have less frequent weekday service

From Monday, Dec. 21, 2020 to Sunday, Jan. 3, 2021 the following routes will operate with less frequent weekday service based on reduced customer demand during this time:

  • 3 Bloor
  • 26 Burnhamthorpe
  • 35 Eglinton
  • 51 Tomken
  • 61 Mavis
  • 66 McLaughlin
  • 76 City Centre-Subway
  • 101/101A Dundas Express
  • 103 Hurontario Express

The following routes will not operate from Monday, Dec. 21, 2020 to Sunday, Jan. 3, 2021:

  • 104 Derry Express
  • 107 Malton Express
  • All 300-series school routes

Some routes have a reduced holiday schedule on Christmas Day and New Year's Day

On Christmas Day and New Year’s Day, the following routes will operate on a reduced holiday schedule based on reduced customer demand on these dates:

  • 1/1C Dundas, Dundas-Collegeway
  • 2 Hurontario
  • 3 Bloor
  • 5 Dixie
  • 9 Rathburn-Thomas
  • 10 Bristol-Britannia
  • 13 Glen Erin
  • 17 Hurontario
  • 23 Lakeshore
  • 28 Confederation
  • 38A Creditview
  • 66 McLaughlin

The following routes will not operate on Christmas Day and New Year’s Day:

  • 6 Credit Woodlands
  • 35 Eglinton
  • 46 Tenth Line-Osprey
  • 48 Erin Mills
  • 68 Terry Fox

MiWay will continue to provide regular Saturday and Sunday service on weekends

From Saturday, Dec. 26, 2020 to Sunday, Jan. 3, 2021, MiWay will continue to provide regular Saturday and Sunday service on weekends.

Customer Service - modified hours of operation

City Centre Transit Terminal Information Booth

From Monday, Dec. 21, 2020 to Sunday, Jan. 3, 2021, the Information Booth at City Centre Transit Terminal will have modified holiday hours of operation.

Weekday Holiday hours of operation
Monday to Thursday 10:30 a.m. to 6 p.m.
Christmas Day and New Year’s Day Closed
Saturday and Sunday 10:30 a.m. to 6 p.m.

City Centre Transit Terminal Fares Booth

From Monday, Dec. 21, 2020 to Sunday, Jan. 3, 2021, the Fares Booth at City Centre Transit Terminal will have modified holiday hours of operation.

Weekday Holiday hours of operation
Monday to Thursday 11:15 a.m. to 7 p.m.
Christmas Day and New Year’s Day Closed
Saturday and Sunday Closed

City Centre Transit Terminal location details

Customer service phone: 905-615-4636

From Monday, Dec. 21, 2020 to Sunday, Jan. 3, 2021, Customer Service will be available on the phone at 905-615-4636 from 9:30 a.m. to 5 p.m. daily.

And the January 4, 2021 Service Change notice:

Jan. 4, 2021 Service Changes

MiWay is implementing service changes that include:

  • Schedule changes on various routes to respond to ridership demand and to improve GO service connections
  • Some school routes (300-series) will resume
  • On the Family Day holiday (Monday, Feb. 15, 2021), buses will operate on a holiday schedule and some routes will not operate

Schedule changes on various routes

Starting Monday, January 4, 2021, schedules will change on the following routes to respond to ridership demand and to improve GO service connections:

  • 9 Rathburn-Thomas
  • 30 Rexdale
  • 44 Mississauga Road
  • 49 McDowell
  • 90 Terragar-Copenhagen Loop

School routes (300-series) resume

Starting Monday, January 4, 2021, the following school routes (300-series) will resume service:

  • 302 Philip Pocock-Bloor West
  • 304 Father Goetz-Mississauga Valley
  • 306 Streetsville Secondary-Terry Fox
  • 307 Philip Pocock-Bloor East
  • 313 Streetsville Secondary-Meadowvale
  • 314 Rick Hansen-Creditview
  • 315 Rick Hansen-City Centre
  • 321 Stephen Lewis-St.Joan of Arc
  • 335 Glenforest South

Holiday service on Family Day

On the Family Day holiday (Monday, Feb. 15, 2021), buses will operate on a holiday schedule and some routes will not operate.

Service will not operate on the following routes due to low customer demand:

  • 28 Confederation
  • 35 Eglinton-Ninth Line
  • 46 Tenth Line-Osprey
  • 48 Erin Mills
  • 68 Terry Fox

Next planned service change – Monday, February 22, 2021.

If an accessible shuttle is required to get passengers with mobility issues from the Kipling Terminal over to the TTC terminal, who would be providing the service?  I assume regardless, it would be coming out of the construction company/Metrolinx' pocket as part of a penalty for delayed completion if such a clause were included.  Until the surface pedestrian route is built and opened, the shuttle would presumably have to run to the east/St. Alban's entrance to the station which is accessible and comes with a fare gate.  The more complicated option would be for the TTC to provide a vehicle where passengers would pay their fare and then continue to the bus platform at Kipling Station.  You'd then run into leasing arrangements for the TTC bus (if GO isn't immediately implementing service it could use one of their bays).

If they're just going to wait until the tunnel construction is all done (I don't know how much work actually needs to be done for it to be opened to the public), we may see a transition mid-board.  Otherwise waiting another 2 months or so would require an extension of the lease at Islington.

  • Thanks 1
Link to comment
Share on other sites

Jan 4th opening was a given due to the board change, subject if everything was in place and working.

Accessibility riders and able body riders can access TTC main entrance by using the north Hub entrance and then the walkway to the station, assuming the plaza area is done. The plaza wasn't ready when I saw it a week ago and not much left to be done for it. There is an elevator in the north entrance and it take riders to the tunnel under the driveway to the hub or up to the walkway way to the GO platform.

As for the tunnel issue, other than access to the elevator at the PPUDO building, can't see why it not ready. The replacement stair in the parking lot has been rebuilt and is ready with a TTC sign at it. One hope that a ramp is where the stairs were to the fare area as its was only a few steps. TTC as well GO needs to look a ramps in place of stair and elevators, especially for elevators since riders will always know they will have access to/from a platform and not worry what to do when the elevator is down or out of service for maintenance. Having one elevator doesn't cut it and must be at least 2 encase one has to be out of service.

They finished paving and stripping the Kiss & Ride area including the taxis area almost 2 weeks ago in front of the PPUDO that not finish.

Its another lets open things before they are finish for show and tell with the accessibility riders, walkers and stroller folks getting screw.

There is an option for an extension for Islington and best to use it and finish the Hub first before moving.

Link to comment
Share on other sites

I'm sure that overcrowding on the TTC for essential workers is not an isolated case in the GTA.  The CBC is reporting on overcrowding on MiWay buses during the lockdown, especially in light of the service reductions associated with the lockdown.  They are featuring the 42 DERRY route, but I can imagine this being replicated on the various routes in and around the industrial area surrounding Pearson.  I'm sure the same is also happening with Brampton Transit.

Prior to the lockdown I know the 39 BRITANNIA and the 35 EGLINTON can get fairly crowded especially between Dixie and Hurontario.  Presumably as those two offer the best service north into Brampton.  There are also some willing to use the 66 McLAUGHLIN or 61 MAVIS.  Unfortunately most Brampton Transit routes do not travel south of the 401 and few MiWay routes cross into Brampton.  If the 51 TOMKEN were to run into Brampton the likeliest place for a terminus would be Bramalea GO.  The 53 KENNEDY isn't nearly frequent enough to make connections with BT's 7 KENNEDY viable or convenient.  Meanwhile the temporary suspension of the 185 DIXIE means having to transfer between MiWay and BT's DIXIE services.  I haven't been on the 57 COURTNEYPARK in a while, so I don't know what origin/destination demand is like along its namesake corridor.

The Hurontario corridor is at the point where Britannia/401 is the dividing line for service.  MiWay has traditionally short turned service on the local Hurontario routes here to provide better service southward, meanwhile I've seen rather long lines for service northward into Brampton for the Züm 502 MAIN service with some taking the 103 HURONTARIO EXPRESS (presumably those transferring at Brampton Gateway) rather than use the local services with a forced transfer at the 407. 

MiWay has gradually been eliminating the rush hour services in favour of a stronger grid network.  That unfortunately leaves a lot of employers with a last mile problem for their employees.  Perhaps some demand responsive service as is being used elsewhere might be a solution?  The article reports that MiWay is monitoring the situation and may reallocate some additional vehicles from other routes that will see reduced service during the holiday season.  What will happen in January when service levels are scheduled to return to normal remains to be seen.

Link to comment
Share on other sites

Well that was fast:

 

The follow-up Service Updates seem a bit confusing though:

Current
  • To ease overcrowding on the route 42, all route 104 buses will now service all stops.
  • Starting Dec. 11, 2020, service will be added to Route 42-Derry due to increased customer demand for service at all local stops. Route 42 provides all day service, 7 days a week. MiWay continues to monitor service demand during the COVID-19 Grey-Lockdown level and will make further adjustments based on customer demand.

Current
  • To ease overcrowding on the route 42, all route 104 buses will now service all stops.
  • Starting Dec. 11, 2020, this route will be suspended. Service will be added to Route 42-Derry due to increased customer demand for service at all local stops. Route 42 provides all day service, 7 days a week. MiWay continues to monitor service demand during the COVID-19 Grey-Lockdown level and will restore services based on customer demand.

The 104 DERRY EXPRESS will now service all stops effectively making it a 42 DERRY.  But it is then being suspended while service on the 42 DERRY is increased.  A somewhat confusing way of saying they've reallocated the 104 DERRY EXPRESS buses to the 42 DERRY.  Since it's mid-board I don't know if they're able to actually increase the overall service/frequency on the route or if they're just redistributing the buses between both routes to beef up the service along the corridor.  I guess the squeaky wheel gets the grease.  How long did it take the TTC to react to similar overcrowding?  I suppose they could do the same with the 87 MEADOWVALE-SKYMARK on Eglinton, but no such luck for the Britannia-Matheson or Courtneypark (?) corridor.

 

Link to comment
Share on other sites

MiWay has now officially announced the changeover from Islington to Kipling on January 4, 2021.

We're moving to Kipling Station

The new terminal map has a note saying the pedestrian tunnel to the TTC terminal and station will be completed in early 2021.  There is currently no indication of how to get from one to the other aside from following the wayfinding signs posted.  The system maps as well need updating.  There is a revised Islington station map with the new through routing of the 26 BURNHAMTHORPE which will no longer enter the station but serve it from the on-street stops.

I'm guessing the TTC is allowing MiWay passengers to transfer to the 26 BURNHAMTHORPE at Kipling to reach Islington?  It is technically Mississauga-bound.  I don't know how far the intra-Toronto passengers can continue to disembark past Islington.  As I had mentioned, there may be some demand to reach the shops and offices on either side of the 427 at Burnhamthorpe.  Either a walk from West Mall over to East Mall on the 20 RATHBURN or allow some passengers to transfer onto the 26 BURNHAMTHORPE within Toronto.  Look for some initial confusion until everyone gets used to the new setup!

I wonder why the lag in announcing the move to Kipling?  They had already announced the Service Changes for January 4, but did not mention it.  Scrambling over what to do with the pedestrian tunnel not being ready probably had something to do with it.  A surface hike from the new Kipling Terminal to Kipling Station in the dead of winter does not sound terribly appealing. 

Until GO starts bus service to Kipling (and once the pedestrian tunnel is open) could the Ikea shuttle - when it resumes - operate from there?  Granted it'd make for a longer walk to get to the TTC routes.  The current pick-up point is in the South parking lot which can get quite congested during rush hours.  A compromise would be the PPUDO in the North lot once it's completed which would put it halfway between the Terminal and the Station.

  • Like 1
  • Thanks 1
Link to comment
Share on other sites

On 12/14/2020 at 10:34 AM, Gil said:

A surface hike from the new Kipling Terminal to Kipling Station in the dead of winter does not sound terribly appealing. 

Isn't walking down the GO platform an option or is there no connection to the TTC terminal and GO platform? I know that's not the best but it's an option until the new tunnel opens

Link to comment
Share on other sites

Lots of jack hammering taking place around the stair area to TTC fare area today. No idea if the stairs are to be rebuilt or be replace with a ramp since it was only about 6 steps in the first place,

If the tunnel not ready come Jan 4th, will have to use the north entrance and the walkway from it to/from TTC entrance. There is a elevator in the north entrance. The walkway and plaza area is 100% for a small section from Auckland that should be done this week or early next week. The PPUDO building interior not finish and no idea if the elevator is working.

Always can walk up to Dundas and catch a TTC bus there and than walk to TTC entrance.

TTC Kiss & Ride and parking lot to open Jan 4th as well. The north parking lot may not be ready to open on the 4th and subject to weather and when it will be pave. The west lot that may hold 150 spot is ready to open now.

Looking at route 3 stops on Aukland today, I expect they will stay since current riders will still find it faster to use than going to the Hub. Since the 3 will be making a right turn onto Dundas than the current left, will the southbound stop move to TTC Dundas stop as it will cut down on the walking distance?

Some LCD Screens being tested for miWay bays.

Time to do shooting around the Islington Terminal since it will become a thing of the past as well miWay buses east of Aukland on Dundas and Bloor.

There has been a plan for some time to pickup riders at the Hub and take them to Islington since it would be for one route only. If miWay riders are transferring to a 26 at the Hub to get to, still Mississauga property and TTC has no objection to this.

4 minutes ago, laliok said:

Isn't walking down the GO platform an option or is there no connection to the TTC terminal and GO platform? I know that's not the best but it's an option until the new tunnel opens

GO station not open during 7 days a week, during the day nor is it accessibly.  The option I pointed out is the best one since it service everyone.

Link to comment
Share on other sites

I'll add drum's photos from the TTC in the News thread:

On 12/17/2020 at 1:02 AM, drum118 said:

There not that many systems in Canada using CNG, yet they are popping up all over the place in the US. Not talking small number, but 100's of buses for each system.

Was part of a round table with MOE with a push from CNG group to get more buses and systems in Ontario to use CNG and it when over like a lead balloon. Still can smell CNG like diesel and not a supporter of CNG.

Unless things change between now and Jan 4th, Kipling Kiss & Ride will open with part or all of the parking lot. The west side has about 150 parking spots ready to go and the bulk of the parking to the north being graded for paving. Weather and EllisDon will be the govern factor if the north parking lot opens Jan 4th. Not sure if the PPUDO building is ready for use nor if the elevator working.

Jan 3rd will be the last time miWay will use Islington Bus Terminal unless something changes before Jan. No idea when TTC will move their Islington routes to the south platform to allow the existing terminal to be torn down in 2021.

By the looks of things, the bus entrance to Kipling will become wider with the shifting of the current sidewalk to the new plaza area and been removed.

50728616612_c8bd647e9a_b.jpg50727797133_60d5cf9e58_b.jpg50728622767_03d363c942_b.jpg50727799568_04c094d99c_b.jpg50728517356_8dd96d95a4_b.jpg50727800803_fce4dfe9ab_b.jpg

GO Transit has a map outlining the detour from the bus terminal to the subway station on the Kipling station update page:

Kipling GO Construction Map

MiWay seems to be taking their time in updating their system maps to reflect the move to Kipling.  Did anyone manage to download the driver's guides for the revised routes that were hastily put up on the Monday of the announcement?  They were gone by Wednesday when they were replaced by the updated route maps.  Transit Toronto also has some additional photos (from Metrolinx/MiWay) along with the platform layout:

Kipling-Bus-Terminal-2.jpg

The layout, if it's accurate/to scale would seem to suggest that the 1/1C DUNDAS buses would have to travel all the way around the terminal to get to their assigned platform and then go all the way around again to safely exit the terminal.  There also isn't a designated offloading platform if the driver has some time to spare before their next trip out, especially with the platforms sharing multiple routes or branches.  Playing around with the schedule, the one high school route, the 307 PHILIP POCOCK-BLOOR EAST will drop off at platform 6 which isn't used at that time of the day since its routes are all rush hour only.  That may work or off-peak drop offs, but during rush hours every platform will likely be busy.

I know space in the terminal has been allocated to both MiWay and GO including staff and layover space for buses.  If the schedules aren't tweaked so as to not have every platform used all at once, would it be possible for MiWay to use GO's platforms to offload?  Even once GO Bus service has started, it won't likely be as frequent as MiWay's service and if a branch of the 21 MILTON bus was ever implemented to serve the terminal, it likely wouldn't be running at rush hours when the trains are running.  I'm not sure that reverse peak direction bus trips will be as frequent either, if they're offered at all (as it would be an intra-Toronto trip between Union and Kipling).

Link to comment
Share on other sites

On 12/23/2020 at 1:30 AM, Gil said:

I'll add drum's photos from the TTC in the News thread:

GO Transit has a map outlining the detour from the bus terminal to the subway station on the Kipling station update page:

Kipling GO Construction Map

MiWay seems to be taking their time in updating their system maps to reflect the move to Kipling.  Did anyone manage to download the driver's guides for the revised routes that were hastily put up on the Monday of the announcement?  They were gone by Wednesday when they were replaced by the updated route maps.  Transit Toronto also has some additional photos (from Metrolinx/MiWay) along with the platform layout:

Kipling-Bus-Terminal-2.jpg

The layout, if it's accurate/to scale would seem to suggest that the 1/1C DUNDAS buses would have to travel all the way around the terminal to get to their assigned platform and then go all the way around again to safely exit the terminal.  There also isn't a designated offloading platform if the driver has some time to spare before their next trip out, especially with the platforms sharing multiple routes or branches.  Playing around with the schedule, the one high school route, the 307 PHILIP POCOCK-BLOOR EAST will drop off at platform 6 which isn't used at that time of the day since its routes are all rush hour only.  That may work or off-peak drop offs, but during rush hours every platform will likely be busy.

I know space in the terminal has been allocated to both MiWay and GO including staff and layover space for buses.  If the schedules aren't tweaked so as to not have every platform used all at once, would it be possible for MiWay to use GO's platforms to offload?  Even once GO Bus service has started, it won't likely be as frequent as MiWay's service and if a branch of the 21 MILTON bus was ever implemented to serve the terminal, it likely wouldn't be running at rush hours when the trains are running.  I'm not sure that reverse peak direction bus trips will be as frequent either, if they're offered at all (as it would be an intra-Toronto trip between Union and Kipling).

Notice posted at the eastbound stop for Aukland as to where 26 will be stopping come Jan 4. Stop going out is at the Beer store/TTC Stop on Bloor and at Aberfoyle Cr on Islington. Inbound at the normal subway stop and the current stop on Bloor St. Need to check route 3 inbound stop to see if it remain as is on Aukland or move down to Dundas where it should be come Jan 4.

Based on what I saw today after getting home, TTC parking lot is ready to open, but not 100% complete. Looks like the interior of the PPUDO is finish with no elevator. Some signs paste to the sidewalk from TTC to the Hub Main Entrance showing an arrow and miWay name. Large signs in place showing direction to TTC on the walkway to TTC that will remain after the tunnel is open.

All miWay LCD screens on with GO being off since they will not be servicing the Hub on Jan 4.

The new sidewalk on Aukland is 99% complete. Unless they have decided to remove a section that was waiting to be pour over a week ago as it back fill at this time leaving a narrow walkway at TTC entrance and the plaza area.

The road in/out of TTC parking lot to/from Dundas is paved with stripping with cycle lanes on it for both direction as well traffic and both sidewalks finish.

Some photos to follow

No one on site working and some cleaning up and moving things still have to happen for opening day.

Should note there is 2 elevators for the main entrance and working.

Not sure what was taking place on Bloor St on my way home, 2 supervisors cars with flasher on at a stop along with an accessibility rider and a police with flasher pull up as I pass the cars. Could be an issue with the accessibility rider that forced them off the bus and the driver needed help dealing with them.

Link to comment
Share on other sites

6 hours ago, soo8513 said:

Strange: 90 is changing from 40 to 41 minute headway mid-day and from 20 to 21 in PM rush. Rather odd.

Which is odd considering the new Hub will save close to 8 minutes travelling time in Toronto. Other than 26, all routes going to the new Hub will save travel time close to 8+ minutes.

If the normal 26 riders getting on at Islington bound for Mississauga, they will see some travel time saving. Those who caught the 26 on Aukland, they will now have a longer travel time and that should be about 5 minutes.

Link to comment
Share on other sites

30 minutes ago, drum118 said:

Which is odd considering the new Hub will save close to 8 minutes travelling time in Toronto. Other than 26, all routes going to the new Hub will save travel time close to 8+ minutes.

90 doesn't serve Islington Station or Kipling Hub.

7 hours ago, soo8513 said:

Strange: 90 is changing from 40 to 41 minute headway mid-day and from 20 to 21 in PM rush. Rather odd.

It's a small runtime adjustment, adding one extra minute during midday and two extra minutes to the PM rush schedule for each round trip. Guess the service planners decided the route was running too tight on its current schedule. Unfortunately it knocks the route off a clockface headway, which is unfortunately common nowadays especially with MiWay.

Looking on Transsee, it looks like the buses are often a few minutes late on each trip in the midday/PM, and those delays sometimes accumulate into bigger ones in the evening.

Because the 90 is a short route, a 30 second or 1 minute delay on each trip adds up quickly with the amount of trips the buses are doing. As well, with the main layover point (Meadowvale Town Centre) in the centre of the route, drivers get two short layovers instead of a longer one, which leads to less time to recover from delays.

Link to comment
Share on other sites

Kipling area is now fully open to walk around it as well check things out. You can park in the new lot as will. 

The old Aukland sidewalk is now close off.

There are still fences around areas not finish yet, but has no impact using the area.

A fair number of large banners on the Hub fence with arrows pointing to TTC and miWay. Only one sign left on the sidewalk

No idea if the elevator is working as crews were working in the PPUDO cleaning it as well removing tools from the tunnel. Signs at the PPUDO say no access to the tunnel at this time. Depending on what taking place in the tunnel as well where. you maybe able to use the tunnel between the PPUDO and the Hub. 

Today marks the end of regular Weekday service to Islington even if it is scale back for the Holidays. Tomorrow marks the last 3 days of service to/from Islington.

Link to comment
Share on other sites

On 12/28/2020 at 4:39 PM, drum118 said:

Notice posted at the eastbound stop for Aukland as to where 26 will be stopping come Jan 4. Stop going out is at the Beer store/TTC Stop on Bloor and at Aberfoyle Cr on Islington. Inbound at the normal subway stop and the current stop on Bloor St. Need to check route 3 inbound stop to see if it remain as is on Aukland or move down to Dundas where it should be come Jan 4.

Based on what I saw today after getting home, TTC parking lot is ready to open, but not 100% complete. Looks like the interior of the PPUDO is finish with no elevator. Some signs paste to the sidewalk from TTC to the Hub Main Entrance showing an arrow and miWay name. Large signs in place showing direction to TTC on the walkway to TTC that will remain after the tunnel is open.

All miWay LCD screens on with GO being off since they will not be servicing the Hub on Jan 4.

The new sidewalk on Aukland is 99% complete. Unless they have decided to remove a section that was waiting to be pour over a week ago as it back fill at this time leaving a narrow walkway at TTC entrance and the plaza area.

The road in/out of TTC parking lot to/from Dundas is paved with stripping with cycle lanes on it for both direction as well traffic and both sidewalks finish.

Some photos to follow

No one on site working and some cleaning up and moving things still have to happen for opening day.

Should note there is 2 elevators for the main entrance and working.

According to the new schedule for the 3 BLOOR it will also be stopping at the TTC stop at Aukland & Dundas.  The Triplinx schedule doesn't give the MiWay stop ID, which one of the site's shortcomings.  There is an internal ID for the site which is applied to every single stop.  I wonder if a toll-free number with that ID could be used?

Another interesting thing I noticed while playing around with the schedules for the 3 BLOOR and 26 BURNHAMTHORPE is that there are no boarding restrictions for the stops between Kipling and Islington, presumably to allow transfers between the two at the only common stop Dundas & Acorn.  The remaining stops along Bloor and Dundas for the 26 BURNHAMTHORPE aren't currently served by the TTC (strange that the route itself is still following the old alignment of Six Points) and there isn't a stop within the reconfigured Six Points so there isn't the worry about duplicating the TTC's service aside from the subway itself.

1960189377_3toKipling.thumb.png.605734d5f37ff151a7c7fc2b718a9434.png  168059334_26IslingtontoKipling.thumb.png.e4cac4e91ec18f713430211721709cd9.png

As for the elevators, they had better be working as that's the only way the new Terminal can be considered accessible.  Any guesses as to which elevators will be up and running next?  The ones at the GO Train platform or the PPUDO to the tunnel?

Dec 28: More up on my Flickr Site

50774057188_ae3de1ac8e_b.jpg50774918507_a59c8a4d3c_b.jpg50774804801_58b468d59b_b.jpg50775384397_452a56f139_b.jpg

I'm hoping the screens will actually have useful information on them and not just a QR code to scan to get the schedule.  If they're not going to be posted in print form at the stop itself, then put the QR code there instead along with at least the route map.

Still waiting on MiWay to update their system maps with the Kipling Terminal service implemented.  Will we have to wait until Monday as all the sets require updates?

It's interesting how the TTC has the same link/notice for the Kipling relocation as MiWay on their homepage.  The also mention the travel between Kipling and Islington in both directions on the 26 BURNHAMTHORPE.

http://ttc.ca/images/hero-features/DigitalScreen_Goodby.png

MiWay service relocating from Islington Station to new Kipling Bus Terminal

Effective date: January 4, 2021

Starting January 4, 2021, MiWay service currently boarding inside Islington Station will be relocated to the new Kipling Bus Terminal.

The MiWay 26 Burnhamthorpe route will continue to serve on-street stops (eastbound and westbound) outside of Islington Station while travelling between Mississauga and the new Kipling Bus Terminal.

To access the new Kipling Bus Terminal from Kipling Station starting in January 2021, a temporary accessible pedestrian path will connect the terminal to Kipling Station’s Aukland Road exit.

Learn more about MiWay see at the new terminal.

Link to comment
Share on other sites

Waiting for the light on Dundas at Kipling going east tonight, watch a 3W come south on Kipling and go west on Dundas. Must be a driver that hasn't drove the 3W at night and deal with the change. Only 3 more night and it will be history. Will have my last ride to/from Islington on Sunday as well get my first ride to/from the Hub on Monday.

On Jan 4, all able body walkers will be using the tunnel between the Hub and PPUDO and the PPUDO stair to/from TTC.

The PPUDO elevator floor is about 3.7 cm below the tunnel floor with the doors open. Is it 100% operational, I can not tell.

There are maps at the Hub and TTC main entrance showing how accessibility riders, people with strollers, walkers or need to use an elevator that they must use the Hub main entrance and the walkway between the Hub and TTC to get to/from the Hub until the elevator is working.

There is also signs in the Hub telling riders there is no elevator in service at the PPUDO and how to get to TTC if they need to use an elevator.

The doors to the Hub Main entrance lock, but the door to the old Subway Cr stair and tunnel wide open. Very little has change in the existing tunnel until you get to the new tunnel for the Hub and PPUDO. That is one wide and dipping tunnel with a nice ceiling height.

Peaking through the crack between the construction doors for the tunnel section close off at this time, it could be late Jan or Feb before that tunnel section can be open. There is no floor tile between the new tunnel and TTC fare area and work taking place for the ceiling. Real hard to say what still needs to be done for the close tunnel as the crack needs to be wider for a better view.

Not surprise at the moving of 3E stop for Dundas and would be if the stop remain as is.

As for 26 stopping between the Hub and Islington, the right thing to do like any route that use TTC stops for drop off or pickup.

Unless I miss it, no fare machine in the Hub to load funds to your Presto card as well an balance checker. Can get your GO ticket from the fare machine on the walkway and only 1 there.

As it stands now, parking will be free for the north lot as there are no machines to buy a day pass like other lots there.

There are washrooms at the HUB.

Link to comment
Share on other sites

Another round of bus retirements to round out 2020 - 0316, 0327, 0329, 0340, 0512, 0520, 0540, 0565, 0570, 0603, 0620, 0866 have been retired.

0620 was the unit involved in a major collision about a year ago.

For those keeping track, that leaves 21/44 2003 D40LFs still active as of right now.

  • Thanks 2
Link to comment
Share on other sites

The MiWayHelps Twitter account has a video demonstrating an able-bodied person using the pedestrian tunnel from the Terminal to the PPUDO.  It cuts off just before actually entering the PPUDO (where the walls go from the white/beige of tunnel to the old red brick cladding in the PPUDO.  Don't get to actually see the PPUDO in the clip at the end.  It's also time-lapsed to fit to about 30 seconds.  Wonder how long the actual walk from the Terminal to the subway station (regardless of the route - tunnel, surface or GO Train platform) will take and if any particular route is faster for the able-bodied not pushing a stroller or cart? 

 

Link to comment
Share on other sites

On 11/12/2006 at 3:10 PM, Mr. Engineer said:

I went to the New Flyer website, and it says that they can garantee their new BRT buses for 18 years. Makes me wonder what TTC will be ordering next time around.

Given the fact only a few 60' have made 12 years, a real hard sell for 18. Most were crapping out at 10 years, especially the 1997 buses.

40' buses will make 18 and we already have that with the 2003 buses and the 2005 are at 15 and going on to 16.

Since miWay buses are to only to last 15 in place of 12 years due to cost, the 2003 are longer due to lack of funding and meeting the timeline for the Feds to kick in extra funding.

That guarantee needs to written lock solid so NFI can fulfill it between the 15 to 18 years. Most things can last longer if you throw money and time at it, but is it worth it??

Dec 31

50789324697_f06d43b980_b.jpg50788458278_607c1ccf69_b.jpg50788458213_0333722742_b.jpg50788458098_44234f3c8c_b.jpg50789324762_a8b07ecf78_b.jpg50789217391_a0f38243dd_b.jpg50789326892_78b18ffd5d_b.jpg50789218911_b866e4c24e_b.jpg50788461163_24cd7a8a81_b.jpg

Link to comment
Share on other sites

Lot of bitching today regarding that long walk in the tunnel.

60' bus and Route 1 bus bay needs to be relocated as buses over hang and block buses going around the terminal or exiting. Same goes when using the GO bus bays. GO Bus bays being use as drop off, or layover.

Lack of signage at both terminal showing how riders get from one to the other even with Mississauga personnel on site cause a lot of confusion for everyone. Even where riders find their bus on the platform. No surprise on my part as expecting this.

The stairs in the tunnel that close being replace with a ramp.

GO personnel stated no GO service to the terminal for some time nor what route may service it. Leave this to others since I don't follow GO service other than rail.

Saw someone use the PPUDO elevator today with Mississauga personnel.

Do to an Opp's, the Hub floor has to be chip to allow Presto machines to be install on the main floor.

LCD screen looks good showing not only when bus is to depart for one route, but up to the next 6 ones. 

Route 3 still stops at the old stop on Aukland coming in.

Link to comment
Share on other sites

With the amount of MiWay buses using this terminal during rush hours (imagine post covid where they restore to 100% pre covid levels), let's hope GO never uses this terminal. The MiWay buses need places for layover. Those 4 bus bays should be for all MiWay bus layover.

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...