Oc4526 Posted September 19, 2021 Report Share Posted September 19, 2021 7 minutes ago, GTAmissions1 said: Until further notice, R1 replacement service in effect for the entire line. Looks like they are working to get the trains back to the yard to avoid further damage or problems getting around the derailment. I think it will be a few days until the derailed train can be removed safely and the signalling equipment repaired. Making sure that once the repairs are done and everything works correctly. Not just repairs, I foresee a full on investigation (possibly TSB involved) which may take longer then “just a few days” 1 Link to comment Share on other sites More sharing options...
MCIBUS Posted September 19, 2021 Report Share Posted September 19, 2021 If the TSB is involved who knows how long a couple of days? couple of weeks, heck if it's serous enough it might even be months? Until the go head the LRT is shut down. Link to comment Share on other sites More sharing options...
Bus_Medic Posted September 19, 2021 Report Share Posted September 19, 2021 2 Link to comment Share on other sites More sharing options...
Loud-Invero Posted September 19, 2021 Report Share Posted September 19, 2021 World class junk... Hopefully no one was hurt Link to comment Share on other sites More sharing options...
Bus_Medic Posted September 19, 2021 Report Share Posted September 19, 2021 44 minutes ago, Loud-Invero said: World class junk... Hopefully no one was hurt I’m not convinced it’s the equipment itself. Link to comment Share on other sites More sharing options...
JCL Posted September 19, 2021 Report Share Posted September 19, 2021 Apparently there was a media briefing earlier at 5:30pm. CBC City Hall Reporter Joanne Chianello tweeted this: Link to comment Share on other sites More sharing options...
JCL Posted September 19, 2021 Report Share Posted September 19, 2021 Patrick Uguccioni is a former staffer who worked with then-Mayor Larry O'Brien who now runs several local community newspapers called "Your Community Voice". He attended the media briefing and did a 6-part tweet. I will copy-and-past Tweets 3 and 4: Link to comment Share on other sites More sharing options...
JCL Posted September 20, 2021 Report Share Posted September 20, 2021 There are a couple of pictures on Twitter showing a bunch rocks on the westbound platform of Tremblay Station (note that the derailed train stopped west of Tremblay, between Tremblay and Hurdman). 1 Link to comment Share on other sites More sharing options...
Mark Walton Posted September 21, 2021 Report Share Posted September 21, 2021 On 9/19/2021 at 1:06 PM, JCL said: There appears to be another derailment - between Tremblay and Hurdman - see tweets below. In the first 2 pictures, the pantograph appears to be so positioned that, if lowered, it could foul the wires. Link to comment Share on other sites More sharing options...
JCL Posted September 21, 2021 Report Share Posted September 21, 2021 On 9/19/2021 at 9:59 PM, JCL said: There are a couple of pictures on Twitter showing a bunch rocks on the westbound platform of Tremblay Station (note that the derailed train stopped west of Tremblay, between Tremblay and Hurdman). Through media reports, TSB's preliminary finding suggests that the train derailed as it arrived Tremblay Station, then departed Tremblay Station already derailed before coming to a complete stop between Tremblay and Hurdman. Article links: https://ottawacitizen.com/news/local-news/derailed-lrt-train-was-off-the-tracks-when-it-pulled-into-station-and-crossed-a-bridge-federal-agency-says https://ottawa.ctvnews.ca/lrt-train-had-already-derailed-before-reaching-station-but-kept-going-tsb-1.5594646 https://www.cbc.ca/news/canada/ottawa/lrt-derailment-tsb-details-1.6184095?cmp=rss 1 Link to comment Share on other sites More sharing options...
JCL Posted September 22, 2021 Report Share Posted September 22, 2021 TSB has apparently made the approval to move the derailed trainset, 1121-1138, back to the Belfast MSF. This is as per Citizen Transit Commissioner Sarah Wright-Gilbert. 1 Link to comment Share on other sites More sharing options...
Oc4526 Posted September 22, 2021 Report Share Posted September 22, 2021 It seems the Rail Supervisors are using ghost white Ford Explorer’s Seen at Rideau 1 Link to comment Share on other sites More sharing options...
Enviro_1203 Posted September 23, 2021 Report Share Posted September 23, 2021 4 hours ago, Oc4526 said: It seems the Rail Supervisors are using ghost white Ford Explorer’s Seen at Rideau This vehicle is for the LRT Superintendent, replaced the old Impala. 2 Link to comment Share on other sites More sharing options...
Flalex72 Posted September 23, 2021 Report Share Posted September 23, 2021 21 hours ago, Enviro_1203 said: This vehicle is for the LRT Superintendent, replaced the old Impala. They've also had it for over a year now, at least. 1 Link to comment Share on other sites More sharing options...
Oc4526 Posted September 24, 2021 Report Share Posted September 24, 2021 51 minutes ago, Flalex72 said: They've also had it for over a year now, at least. Thanks. It’s the second time this year I’ve seen it. in other news. changes coming to the R1 per 1 Link to comment Share on other sites More sharing options...
JCL Posted September 27, 2021 Report Share Posted September 27, 2021 Transportation Safety Board has issued a safety letter regarding the derailment incident on August 8, 2021 near Tunney's Pasture. https://www.tsb.gc.ca/eng/securite-safety/rail/2021/r21h0099/r21h0099-617-02-21.html 1 Link to comment Share on other sites More sharing options...
Shaun Posted September 27, 2021 Report Share Posted September 27, 2021 1 hour ago, JCL said: Transportation Safety Board has issued a safety letter regarding the derailment incident on August 8, 2021 near Tunney's Pasture. https://www.tsb.gc.ca/eng/securite-safety/rail/2021/r21h0099/r21h0099-617-02-21.html It should be criminal negligence to put a train that was pulled out of service for a fault and was not inspected before being put into service. Heads need to roll. The TTC has been running streetcars for a 100 years and they dont have issues with overheating bearings or defective cars being put back into service without inspection. So there must be something wrong with their process in maintaining and inspecting vehicles. And i hope they do something before someone gets killed. There is no alert in the cab for hot axle bearings? That should be a standard feature. Link to comment Share on other sites More sharing options...
OCCheetos Posted September 27, 2021 Report Share Posted September 27, 2021 Just now, Shaun said: It should be criminal negligence to put a train that was pulled out of service for a fault and was not inspected before being put into service. Heads need to roll. The TTC has been running streetcars for a 100 years and they dont have issues with overheating bearings or defective cars being put back into service without inspection. So there must be something wrong with their process in maintaining and inspecting vehicles. The train was not put back into service (it was deadheading to the yard) and the car that derailed was not the one that had been inspected. 1 minute ago, Shaun said: There is no alert in the cab for hot axle bearings? That should be a standard feature. The TSB letter comments on this. Link to comment Share on other sites More sharing options...
smallspy Posted September 28, 2021 Report Share Posted September 28, 2021 18 hours ago, Shaun said: There is no alert in the cab for hot axle bearings? That should be a standard feature. To the best of my knowledge, no rapid transit equipment built anywhere in the world is equipped with any sort of bearing monitor. As they are maintained in one (or relatively few) locations, and are inspected more often than full-sized railway equipment, it is felt that they are not needed. Dan 1 Link to comment Share on other sites More sharing options...
Oc4526 Posted September 28, 2021 Report Share Posted September 28, 2021 Noticed this evening that the Fare Gates/Washrooms at Hurdman are now available (with staff guarding the Stairs/Elevators ) So if I’m correct, the following Stations are accessible (Fare gates only) . Tunneys past (Washrooms closed) , Hurdman (Washrooms Open) & Blair (Washrooms open?) with the rest closed. Link to comment Share on other sites More sharing options...
JCL Posted September 28, 2021 Report Share Posted September 28, 2021 Just now, Oc4526 said: Noticed this evening that the Fare Gates/Washrooms at Hurdman are now available (with staff guarding the Stairs/Elevators ) So if I’m correct, the following Stations are accessible (Fare gates only) . Tunneys past (Washrooms closed) , Hurdman (Washrooms Open) & Blair (Washrooms open?) with the rest closed. The washrooms at Blair Station are open, and have always been open during past planned/unplanned closure. 1 Link to comment Share on other sites More sharing options...
Oc4526 Posted September 29, 2021 Report Share Posted September 29, 2021 Went by Tremblay Stn this afternoon and noticed they were pulling the WB Rails / Ties and infrastructure out . Defiantly going to be a while until full line 1 service is up and running. 1 1 Link to comment Share on other sites More sharing options...
Loud-Invero Posted September 29, 2021 Report Share Posted September 29, 2021 9 hours ago, Oc4526 said: Tunneys past (Washrooms closed) To be honest it's so stupid they're not mitigating their own design flaw. They can close platform 2, while having either signs or pylons or something giving a visual aid along platform 1 that there's no train service, but no... they close the whole station which locks people out to use the facilities. Think people are just gonna visit another station that has one opened? Well, if they're going further west via BRT, chances are they'll just go along the outer edges of the stations (from what I've seen) and it's unacceptable that people have to see that because of this stupid station design. Let's set aside bathroom breaks... what about happy Goat coffee? They're still not open, but inherently they have to stay closed, putting the people out of a job until the station reopens, nevermind let's say, a diabetic needs a quick sugary snack to stay alive... Link to comment Share on other sites More sharing options...
Waiting for 30 Minutes Posted September 29, 2021 Report Share Posted September 29, 2021 13 hours ago, Loud-Invero said: To be honest it's so stupid they're not mitigating their own design flaw. They can close platform 2, while having either signs or pylons or something giving a visual aid along platform 1 that there's no train service, but no... they close the whole station which locks people out to use the facilities. Think people are just gonna visit another station that has one opened? Well, if they're going further west via BRT, chances are they'll just go along the outer edges of the stations (from what I've seen) and it's unacceptable that people have to see that because of this stupid station design. Let's set aside bathroom breaks... what about happy Goat coffee? They're still not open, but inherently they have to stay closed, putting the people out of a job until the station reopens, nevermind let's say, a diabetic needs a quick sugary snack to stay alive... The mezzanine at Tunney's Pasture was never closed. There was some confusion the first day, but it was resolved before morning peak. The Happy Goat at the location is also incomplete, so no snacks even before the train had its oopsie. The diabetics I know always have a snack on hand. Like...always. 2 Link to comment Share on other sites More sharing options...
Mark Walton Posted September 29, 2021 Report Share Posted September 29, 2021 Some people are complaining because they can't access the fare machines to reload their Presto cards. They can also do that online, or set up their cards to autoload or autorenew. 1 Link to comment Share on other sites More sharing options...