All shelters along the street level section of Line 5 have been installed! The newly installed structures at the Sloane stop are now waiting on their finishing touches pic.twitter.com/vbXXAmeC4D— Crosstown (@CrosstownTO) March 5, 2021
All shelters along the street level section of Line 5 have been installed! The newly installed structures at the Sloane stop are now waiting on their finishing touches pic.twitter.com/vbXXAmeC4D